Preventive maintenance that is on a schedule, not left to memory
Preventive maintenance means checking and servicing equipment before it fails. In TaskLoop you set up daily, weekly, monthly, quarterly or annual schedules, inspection rounds and checklists once, and each check is generated automatically as a task with an owner, a deadline and photo proof.
The loop
How it works
-
Plan
The chief engineer sets up schedules for routine checks, such as AHU filters, chiller readings, pump rooms and fire doors.
-
Assign
On each due date TaskLoop creates the task for a technician or the maintenance department, with a deadline.
-
Act
The technician works through the checklist, notes what they found and attaches a photo.
-
Review
Completed and overdue checks show on the dashboard, and late ones escalate to the supervisor.
What preventive maintenance means here
Preventive maintenance is planned work done before equipment fails. Examples are changing the AHU filter before airflow drops, checking the chiller before a heatwave and testing fire doors before an inspection. In TaskLoop, each of those checks is a task: one owner, a deadline, instructions and an optional photo when it is done.
The hard part of preventive maintenance is not knowing what to check. It is making sure the check actually happens week after week, when the same technicians are also dealing with breakdowns and resident complaints. A paper log on the plant-room door shows what someone wrote down. It does not show what was skipped.
The workflow, step by step
1. Set up the schedule of routine checks
The chief engineer or facility manager sets up the routine work for the building. This usually means AHU filter changes, chiller and cooling-tower checks, pump-room walk-throughs, fire-door and emergency-lighting tests, water-tank inspections and lift lobby checks. Manufacturers’ manuals and local codes set the intervals. Our schedule template for residential towers is a useful starting point.
2. TaskLoop creates each task on time
Each check is scheduled on the admin dashboard and assigned to a technician or to the maintenance department, with a deadline, instructions such as “record suction and discharge pressure” or “photo of the filter label”, and a checklist where needed. TaskLoop then creates the next task in the series automatically, daily, weekly, monthly, quarterly or annually.
3. The technician does the check
The technician sees the task on the staff app, accepts it, does the check and marks it complete. A photo of the gauge, the new filter or the signed tag goes with it. TaskLoop records who did it and when.
4. Review what is done and what is late
The dashboard shows completed checks and open ones. If a check is not done by its deadline, it escalates to a supervisor, so a skipped filter change becomes visible within days rather than at the next breakdown.
Who uses it
- Chief engineer / facility manager. Owns the list of checks, assigns them and handles escalations.
- Maintenance technician. Receives, completes and photographs the checks on a phone.
- Building manager / community manager. Looks at the reports to see whether planned work is being done.
- Owner or auditor. Gets timestamped records with photos instead of a signed paper sheet.
What the screen shows
On the dashboard, preventive tasks appear in the same live list as reactive work orders. Each one shows its owner, deadline and status, and department workload shows whether maintenance has time for planned work this week. On the staff app the technician sees a short list: “Tower B, AHU-3, replace filter, due Thursday”, with buttons to accept and complete and an option to add a photo.
Preventive and corrective work together
Planned checks and breakdown jobs go to the same technicians, so they belong in the same queue. When both sit on one dashboard, the chief engineer can see when reactive jobs are pushing planned work aside. That is often the earliest sign that a building needs more maintenance hours or a different shift pattern.
Getting started with schedules
Start with the checks that slip most often, usually filters, fire doors and emergency lighting. Set each one up as a schedule with an owner, a deadline and a short checklist, and let TaskLoop generate the tasks. After a month, the reports show which schedules run on time and which need a different owner or interval.
Contractor checks
Outside service contractors can be assigned scheduled checks, such as the quarterly lift service or the annual fire system test, and close them with photo proof in the same record as your own team’s work.
What it doesn’t do
- Sensor triggers. TaskLoop does not read data from your BMS. It does not open a task because a sensor reading crossed a limit.
- Asset registers and spare parts. TaskLoop tracks the check and who did it. It does not track the full asset hierarchy or stock levels the way a dedicated CMMS does.
Questions people ask
Can TaskLoop create preventive maintenance tasks automatically every week or month?
Yes. You set up a preventive-maintenance schedule once, daily, weekly, monthly, quarterly or annual, and TaskLoop generates each task automatically with its owner, priority, deadline, instructions and photo proof. Overdue tasks escalate to supervisors.
Is TaskLoop a BMS that monitors my plant?
No. A building management system controls and monitors HVAC, lighting and other plant through sensors. TaskLoop manages the people side, meaning who checks the chiller, by when, and whether they did. The two work side by side.
Can I attach a checklist to a maintenance task?
Yes. Inspection rounds and checklists are part of scheduled work, so the technician works through the check steps on the staff app and can attach a photo when they complete it.
How do I prove a check was actually done?
Each completed task records who completed it and when. The technician can also attach a photo, for example the new filter in place or the gauge reading. That gives an auditor or building owner more than a signature on a paper sheet.
Does it handle reactive breakdowns too?
Yes. Reactive jobs such as a tripped breaker or a lift fault go through work orders, the same flow used for every request. Preventive and corrective work then sit on one dashboard, which helps when you want to see whether planned checks are reducing breakdowns.
Where can I get a starting schedule for a residential tower?
Our blog has a preventive maintenance schedule template for residential towers that you can adapt. It is a starting point, not a rule. Manufacturers' manuals and local codes set the real intervals for your equipment.
See your own workflow in TaskLoop
Tell us how requests reach your team today. We will show you the same flow running in TaskLoop, with your roles and your request types.